Long Ride with Snake
>> Monday, May 19, 2025
The bike trail under I-35E along Shepard has been closed for a few weeks. And so is the river crossing at I-35E. I've been missing out on my favorite semi-hilly ride, along with the "tempo loop" that I like to do as a "check in" of my bike speed.
Last week, I checked on the progress (it LOOKS like it could open soon!), and then biked back up to the Hwy 5 river crossing. The only problem with that is you have to dismount, walk down 40 steps with your bike to the bridge, bike across the short bridge, and then walk up 40+ steps on the other side to get back to biking. And then cross the high and long Mendota Bridge which can be wicked on windy days! But the good news is that after doing all of that, I'm back on my favorite semi-hilly course.
The bridge that's annoying to bike across.
Hi little fella!
Close-up of his face.
That was the last day it was WARM last week, and then it was 40 degrees and super windy when it was time to bike this past weekend. I stayed on the trainer for that and just did 4x10 efforts in the middle of 100 minutes of riding.
It should finally warm up again this weekend, so I can finally plant all of my started-from-seed plants in our veggie garden. It was 70-80 a few days last week, and since then we've had lows in the 40s and highs in the 50s.